130' HIGH PERFORMANCE SLOOP
 

 

This new high tech project is already under construction at Wally Europe Shipyard in Fano, Italy. Featuring water ballast combined with a trim tab lifting keel. An extensive research program is underway, including CFD, VPP and FEA analysis. A very aggressive attitude has been adopted towards speed, since even though the boat will cruise, racing will be a part of her life..
Endless aesthethics studies were done to suit the bulkward concept. Finally an inverted and chamfered sheer line was adopted using as a starting point our design 37. We tried many geometries for the central coaming, ending with a minimalistic and modern shape in the middle of a flush deck.
Below deck, the layout features includes an owner´s cabin with an aft space opening into the Terrace on the sea. The rest of the accommodation is for two guests in a double cabin and six crew in four cabins. The dining area includes the galley and is used by the owners and guests and as a crew mess.

   
LOA 39.9 M.
BEAM MAX. 7.90 M.
DRAFT 6.00M / 4.50 M.
DISPLACEMENT 88000 KG.
SAIL AREA 735 M2
INTERIOR DESIGN FOSTER & PRTNS
SHIPYARD WALLY
PROJECT MANAGER ODO GIORDO
DESIGN 50 2005